Loading
Loading
Main screen: what is in the air right now, which regions are under alert and the outcome of the response forces' work. Below — the sensor network composition and protection project readiness. Red marks what requires a decision.
Active targets
…
Tracked by detection assets right now
Detected
…
Counting…
Prevented
…
Targets destroyed by mobile fire teams
Success rate
—
Share of targets destroyed among those tracked
loading…
Loading…
Teams deployed
…
Road distance covered
…
Targets destroyed
…
Shift log entries
…
Mileage and kills are actual — the system computes them from routes and engagements. Fuel consumption in the report is derived from mileage using the rated norm: the system has no fuel level sensor.
UAV detection radars
19125 km
Electro-optical posts
24,1725 km
Masts with acoustics
22,8362 km
Mobile fire teams
1,2970–3 km
Regions covered: 83. Teams per region — from 10 up to 20, on average 15.6. Communication masts come from an OpenStreetMap export; coverage is incomplete.
How close the project is to delivery. Red figures mark where progress has stalled.
Solutions confirmed
3/16
13 items lack confirmed applicability to the facility.
Critical gaps
3
Critical-priority items without confirmation.
Interfaces operational
0/9
2 blocked by legal rulings; the rest are planned.
Confirmed cost
9.5mln ₽
Prices obtained for only 1 items out of 16. A full cost estimate is impossible.
Critical-priority items with no confirmation.
| Code | Solution | Product | On site | Integration |
|---|---|---|---|---|
| OB-01 | Radar 96L6Undefined | 3 | N/A | N/A |
| OB-02 | Radar 1L122-1Undefined | 3 | N/A | N/A |
| OB-03 | EW complexes (channel jamming)Undefined | 3 | N/A | N/A |
Source: vendor materials and the document set of ARCH-045.239
How many solutions cover each layer and whether any of them are confirmed.
Early detection
Radar, RF direction finding, acoustics
Confirmation
pan-tilt optics, thermal imagers, observation UAVs
Classification
Data fusion, AI target-type recognition
Response
Electronic warfare, interceptor UAV, mobile teams
Engineering protection
Mesh screens, KOZ-U-Sh barriers, gabions
Perimeter and transport security
Fencing, checkpoints, access control, zone monitoring
Next action
11 of 12 tasks have no owner. Until they are assigned, project timelines are not tracked.
Open tasks